WAPDA Rules 2026. With rising electricity tariffs and Pakistan’s joint family culture, one question is dominating Google searches in 2026: Can you install more than one electricity meter in a single house under WAPDA rules?
The short answer is yes, but only if specific conditions are met.
This guide explains the latest WAPDA Rules 2026, eligibility, myths, and the exact legal process.
Understanding WAPDA Rules 2026 (Latest Update)
In recent months, social media rumors created panic that the government had banned additional electricity meters. To clear confusion, the Power Division of Pakistan, in coordination with WAPDA and NEPRA, officially clarified the policy for 2026.
Key Policy Insight
Multiple electricity meters are still allowed in one house if each portion qualifies as an independent residential unit.
This clarification mainly benefits:
- Joint family households
- Tenants living in separate portions
- Landlords renting out floors or units
Quick Overview: WAPDA Additional Meter Policy 2026
| Category | Details |
|---|---|
| Policy Year | WAPDA Rules 2026 |
| Multiple Meters Allowed | Yes (with conditions) |
| Eligible Users | Owners & Tenants |
| Main Authority | WAPDA / DISCOs |
| Inspection Required | Yes |
| Official Website | wapda.gov.pk |
Are Multiple Electricity Meters Allowed in One House in 2026?
Yes. According to WAPDA Rules 2026 and NEPRA Consumer Services Manual, there is no nationwide ban on installing more than one electricity meter in a house.
However, approval depends on physical separation, not just family demand.
Important Clarification
- One meter per independent unit
- Not one meter per family member
- Not allowed to misuse subsidized tariff slabs
Conditions Required for Installing an Additional Electricity Meter
To qualify for a second or third electricity meter, your house portion must meet all mandatory criteria.
Mandatory Structural Conditions
- Separate entrance and exit
- Dedicated kitchen
- Independent electrical wiring
- Clearly defined living space
Legal & Administrative Requirements
- Affidavit confirming separate household
- CNIC of applicant
- Ownership or tenancy proof
- On-site inspection by DISCO officials
Important: If even one condition is missing, the application can be rejected.
Can Tenants Apply for a Separate Electricity Meter in 2026?
Yes — tenants are fully eligible under WAPDA Rules 2026.
Tenant Eligibility Criteria
Tenants must provide:
- Written permission from landlord
- Valid rent agreement
- Separate portion with kitchen & entrance
- Independent wiring
This policy reduces disputes between landlords and tenants and ensures transparent billing.
Myths vs Facts About WAPDA Multiple Meters
| Myth | Reality |
|---|---|
| Only one meter is allowed per house | False |
| Government removed all extra meters | False |
| Tenants cannot apply | False |
| New meters are banned in 2026 | False |
| Subsidy misuse is unchecked | False |
Step-by-Step Guide: How to Apply for an Additional Meter
Applying for a new or additional meter is straightforward if documents are complete.
Application Process
- Visit your local DISCO office (LESCO, FESCO, IESCO, MEPCO, K-Electric, etc.)
- Request the New Connection / Additional Meter Form
- Submit required documents
- Wait for site inspection
- Pay security deposit & charges
- Meter installation after approval
Documents Required for Additional Electricity Meter
| Document | Purpose |
|---|---|
| CNIC Copy | Identity verification |
| Property papers / Rent agreement | Legal authority |
| Affidavit | Proof of separate household |
| Wiring verification | Safety & compliance |
| DISCO inspection report | Final approval |
Government Monitoring & Subsidy Control Policy (2026)
In 2026, the Power Division introduced stricter monitoring to prevent:
- Misuse of subsidized tariff slabs
- Multiple meters under one CNIC
- Fake household separation
What This Means for Genuine Users
If your portion is legally separate, you are safe and eligible.
Common Reasons Why Applications Get Rejected
Understanding rejection reasons can save time:
- No separate kitchen
- Shared electrical wiring
- Fake affidavits
- Structural ambiguity
- Landlord objection (for tenants)
FAQs
Can I install two electricity meters under one CNIC?
Yes, if each meter serves a separate household unit and passes inspection.
Is a separate kitchen mandatory for a second meter?
Yes. Without a kitchen, approval is unlikely.
Are old additional meters legal in 2026?
Yes, if installed legally, they remain valid.
How long does approval take?
Usually 2–4 weeks, depending on DISCO workload.
Can WAPDA remove an existing meter?
Only if it violates rules or subsidy misuse is proven.
Conclusion
Under WAPDA Rules 2026, installing more than one electricity meter in a single house is completely legal — provided the portion is structurally independent and meets official requirements. This policy supports joint families, tenants, and landlords while ensuring fair electricity distribution.










